User:Dkretz/DPToo
About DP Too
DPToo is a modified version of the existing DP software. It was tested on an experimental Canadian site (www.dp50.org). Development is currently frozen.
The workflow management design is altered from Project Rounds to Page Tasks (explained below). Different projects can have different workflow sequences; so can different pages within the same project.
Each page can move through its workflow independently of other pages in the project.
There are many opportunities in the software to plug in new proofing tools, quality measurement logic, and flow control points.
Operational Discussion
This section of the document discusses the design from the point of view of the user.
This section is intended to take priority over the technical one. It will be preferred to work through the operational and user requirements first, and then require that the software and database accommodate.
Administrative Procedures
Administrative tasks and procedures.